
World Bank Group and Ministry of Finance of Tajikistan have signed a financing agreement under the Central Asia Regional Electricity Market Interconnectivity and Trade (REMIT) Programme, under which Tajikistan will receive a USD 60 million grant to strengthen high-voltage transmission infrastructure and support regional electricity market integration. The project includes construction of a 500 kV transmission line between the Dushanbe and Regar substations and expansion of both substations to accommodate the new infrastructure. It also covers preparation of a feasibility study and detailed design for the proposed 500 kV Rogun-Saykhun transmission line (South-North, Phase 2), aimed at further strengthening Tajikistan’s backbone transmission network.

Powerline
Biomass Magazine
Biomass Magazine
PV Magazine
Eco Generation
Renewable Energy Magazine
Mercom India
Mercom India
Mercom India
Mercom India
Energy Global
Energy Global
Energy Global
Transformers-Magazine
Switchgear Magazine
Switchgear Magazine
EQ Mazagine
EQ Mazagine
EQ Mazagine
PV Magazine